MAIN EV Directions ↗

Now live · El Cajon, CA

Fast charging,
right on Main.

El Cajon's newest fast-charging station is open — 14 chargers, DC fast speeds up to 100 kW, and Level 2 for longer stays. Pull in, plug in, and get back on the road.

MAINEV 100 kW MAINEV Fast Charging

14

chargers on site

100 kW

max DC fast speed

24/7

open every day

2

charge levels · DC + L2

// What's in the ground

Two speeds.
Pick your plug.

Every unit is networked, card-and-app friendly, and monitored around the clock.

DC Fast

up to 100 kW

Dual-cable DC fast cabinets that take most EVs from low battery to 80% in roughly 20–40 minutes. Grab a coffee — you'll be charged before it cools.

  • CCS1 · two cables per cabinet
  • 6 cabinets · 12 fast plugs
  • Best for road trips & quick top-ups

Level 2

AC · J1772

Eight pedestal-mounted chargers for a slower, steadier fill — ideal when your car is parked a while anyway. Plug in, go do your thing, come back to a full battery.

  • J1772 connector
  • 8 plugs across the lot
  • Best for errands & longer stays

// Station board

14 chargers,
ready when you are.

Roster · El Cajon site · July 2026

Level 3 · DC Fast 6 units · 12 × CCS1
# 100852
CCS1
CCS1
Available
# 100853
CCS1
CCS1
Available
# 100854
CCS1
CCS1
Available
# 100855
CCS1
CCS1
Available
# 100856
CCS1
CCS1
Available
# 100857
CCS1
CCS1
Available
Level 2 · AC 8 units · 8 × J1772
# 101343
J1772
Available
# 101344
J1772
Available
# 101345
J1772
Available
# 101346
J1772
Available
# 101347
J1772
Available
# 101348
J1772
Available
# 101349
J1772
Available
# 101350
J1772
Available

// Location

Look for the green sign.